T-minus 4 Weeks until Move-In Deadline

Well, I tried to extend our rental lease for August - but it's no dice. So, we have to be moved out (and in) by July 31st. Michael recently finished putting up all the drywall (walls and ceilings). We're waiting on an inspection from the city. It's scheduled for tomorrow.🤞

Michael installing drywall on the ceiling of Cypress's bedroom closet.

New dishwasher. Check out those countertops! Those are staying (for now).

Coral's bedroom, all dry-walled.

View from inside the new master bathroom, looking out into the bedroom.

I designed an ombre shower tile wall with the help of Floor & Decor. These are the 3 colors. Our General Contractor is supposed to have his "tile guy" do this soon. 

This is a photo of a recycled glass countertop from IceStone (color: Sky Pearl). I've gotten a quote for a remnant that I want to buy for the new bathroom vanity top. The slab weighs 185 lbs., so shipping is as much as the stone (NJ to SC). Because we don't own a forklift, it really needs to be delivered someplace local to us (that has a forklift) so that Michael can pick it up with his tool trailer. He can then cut it to size in the trailer and then be able to get it into the house. Anybody have access to a forklift? 

Michael painting the temporary ceiling in the carport. The house is white with a light pink accent color. We are gradually changing the accent color to turquoise. 

Once the inspection happens, the electric will be completed. Then, we can power-up the air conditioner (among other things). The flooring (bamboo and cork) needs time to dry out before Michael can install it. This weekend we will choose and purchase all the interior paint. The air ducts are scheduled to be professionally cleaned. It's going to be close folks. 